Specifications |
|
|
Operation Weight: |
2.7 ton |
|
Bucket Capacity |
0.1 m³ |
|
Swing Speed |
1-10 km/h |
|
Gradeablity |
58° |
|
Max.Bucket Digging Force |
23.5 kN |
|
Max.Arm Digging Force |
14 kN |
|
Engine |
Kubota EPA |
|
Engine Model |
D1105-E4B |
|
Power/revolution speed |
14.2kw /2000 prm |
|
System Pressure |
20.5 Mpa |
|
Machine size |
|
|
Dimension Length*Width*Height |
4195*1550*2480 mm |
|
Cabin Height |
2480 mm |
|
Axle Base |
1563mm |
|
Wheel(track) Distance |
1250 mm |
|
Minimum ground clearance |
285mm |
|
Min.ground clearance |
285mm |
|
Tail Swing Radius |
860 mm |
|
Working range |
|
|
Max.Digging Height |
4427 mm |
|
Max.Dumping Height |
3005 mm |
|
Max.Digging Depth |
2830 mm |
|
Max.Vertical Digging Depth |
2500 mm |
|
Max.Digging Radius |
4835 mm |
|
Min.Swing Radius |
2160 mm |
|
Max.Dozer Blade Lifting Distance |
308 mm |
|
Max.Dozer Blade Cutting Distance |
360 mm |
|
System pressure |
27 mpa |
|
Flow rate |
62L/min |
FAQ
1. How to Choose an Excavator by Tonnage?
Mini (1-6 tons): Municipal pipelines, landscaping, interior renovation. Key features: "Fits through doors, doesn't damage roads."
Small (6-20 tons): Rural house building, road repair, small earthworks. The most versatile "payback machine."
Medium (20-30 tons): Real estate infrastructure, mining support, river dredging. The main workhorse model.
Large (30+ tons): Large-scale mining, land reclamation, deep foundation pits. A major capital investment.
2. Tracked vs. Wheeled: How to Choose?
Tracked (90% market share): Lower ground pressure, better stability, suitable for muddy, mountainous, and complex conditions. Disadvantage: Requires a trailer for transport and can damage road surfaces.
Wheeled: High mobility, ideal for multi-site urban work and emergency repair projects. However, climbing and soft-ground performance is weaker than tracked models.
3. What are the "Life-Saving" Rules for Excavator Operation?
The "Three Nos" are Strictly Forbidden: Do not leave the cab without shutting off the engine; do not stick your head out the window; do not turn on slopes.
The "Three Checks" Before Work: Check track tension; check hydraulic hoses for leaks; check the surrounding environment (especially for power lines).
The "Three Secures" for Transport: Secure the bucket; retract the arm; lock the cab door.
4. How to Dig Trenches / Level Ground Efficiently?
Trenching Technique: Dig the center first, then trim the sides; use track movement to keep trench walls straight.
Leveling Technique: Use the back of the bucket to "scrape" level, don't "dig" with the teeth; keep your eyes on the contact line between the bucket and the ground, not just on the bucket itself.
Hot Tags: 2.7 ton mini excavator, China 2.7 ton mini excavator manufacturers, suppliers, factory, Electric Excavator